The first round of cluster nodes arrived in Beckman on 06 May 2004. Our first indication of this was a fairly panicked phone call from receiving, worried that we had filled up their entire loading dock with 52 machines and two racks... Unfortunately, as our machine room was not yet set up, we didn't have anywhere to put them; all we could do was take some pictures...

(prev) Machine Room Ceiling

Back

Machine Room Floor, II

From the other angle. The tiles are there, but aren't ready to go down until power is worked out.

Pictures by Tim Skirvin (most) and John Stone (anything with Tim in it)